Renovation of passenger ticketing and customs facilities. Major overhaul of HVAC systems for passager comfort in ticketing lobbys and customs entry area. Installatiion includes several rooftop units and AHUs. Instalaltion of large chill water piping from the basement to the roof of terminal with exterior runs requiring 10 inch metal jacketed piping. Large 52 inch diameter ducts were custom constructed by SSM’s full sheetmetal shop and installed onsite. Access to sensative airport areas were not an obstacle, because of SSM’s experience and reputation on several airport projects.

Details

4 AHUs, Exhaust, 316 stainless steel ductwork 5 ft by 4 ft, 10ft x 5 ft plenums